Head Office: Spain: Tel: +34 983 549 900
Offices In Europe: Spain: +34 983 54 99 00 | France: +33 975 181 356
Poland Plastics: +48 223 071 201

Used machine: Metallizer GENERAL VACUUM EQUIPMENT K4000-1250 - 2007

Data Sheet of Used GENERAL VACUUM EQUIPMENT K4000-1250

Ref. 300044571

Year: 2007

Brand: GENERAL VACUUM EQUIPMENT

Model: K4000-1250

Status: For sale

Delivery time: Immediate

Technical Specifications

Web Width: 1250 mm

Material Type: PET BOPP, CPP, LDPE, NYLON, UPVC, PAPER

Maximum Reel Diameter: 1000 mm

· WINDER: 1000

Film Speed: 600 m/min

Diffusion Pumps: 17500

Roots Blowers: 4035

Other Specifications:

Materials
BOPP 10 to 50 um
PET 9 to 50 um
CPP 20 to 40 um
LDPE 25 to 50 um
Nylon 12 to 50 um
UPVO 20 to100 um
PAPER 60 to 100GSM

Maximum width 1250 mm
Minimum width 625 mm
Maximum line speed 840 mt/min

Winding specification
Maximum winding tension 274 N
Minimum winding tension 23 N
Maximum drum tension 658 N

Roll specification
Maximum diameter unwinder 1000 mm
Maximum diameter rewinder 1000 mm
Core diameter (internal) 152 mm

Evaporation Boats : 14 : Size – 150x35x10 MM

Pumping Systems
2 x diffusion pumps 17500 L/Sec
2 x rotary pumps 755m3/h
2 x roots pumps 4035m3/h
1 x boosters pumps 9720m3/h
1 x cryogenic panel PFC 1100-HC

Coating performance
Rate 2.2 O.D. 630 m/min
Uniformity +- 5%

Chiller system
The chiller is a combined heating and refrigeration unit employed to cool the process drum end post-coating roller during web coating.

Chiller specification
Cooling medium Water/glycol
Minimum temperature -15C
Temperature uniformity 1C
Standby temperature +20C
Reheat time To +20C in 5 min
Chiller control - Healing and cooling cycles are automatically controlled for reduced supervision

Average power consumption 188 kW
Standbypower consumption 70 kW

Refurbished Details:
- All Thyristor Change In Year 2018. Make : Advance Energy
- 1 Booster Pump Change In 2021. Make : Leybold
- 1 Root Pump Change In 2021. Make : Leybold
- PLC, Drives & Control : Siemens S7 With simoreg drives for the machine and process control, via supervision PC.
The evaporation boats are controlled by a separate cabinate with advance energy. (Update new all in year – 2018)

Other Details:

Rebuild: 2018

Guarantee: Without guarantee

Current condition: In Production

Availability: Immediate